At Maxo we lead projects of large magnitudes. We execute all our services under the PHVA scheme and the high standards of integral security.
Carry out the preliminary studies of verification of the conditions of the load and of the routes in order to define the logistics necessary to ensure that the transport of the cranes
Transport each of the mining crane
Modular self-propelled units configured according to the capacity of:
3 X 16: 48 LINES
2 X 16: 32 LINES
10 x 2: 20 LINEAS
10 X 12: 24 LINES
11 cranes - weight between 400 tons - to 1,200 tons
Displacement and removal of 2 engines old CAT 3612 and entry of 2 new
Transport
Supply of Cranes
Engineering (transport plans - manufacture, design and installation of brackets)
Crane 300 tons Skid system
Accessories: Distributors, elephant legs, 4 axle low bed
2 Engines of 4 x 2 x 2.5 meters of 35 tons.
A company with service in over 35 countries around the world, installing more than 14,800 cable car systems.
Transport and hoisting of the cable positioning towers
Assembly of the main and intermediate stations of the cable subway
Crane RT 180 Liebherr LTM 1130 Support team:Male car
Towers: height 25mts - Weight: 4 to 14Tons - mounting radio with crane up to 18mts
Approximately 288 Columns that will support the new structure have to build parallel to the old bridge.
Lifting Maneuvers
Above boat
Kobelco Crane
Celosía 250 Tons.
80 Tons with a turning radius of 8 m
Transportation, assembly, and commissioning of a power transformer.
Lifting and transportation from station Charquito to station Nueva esperanza.
Modular 12 Lines
Modular SPM 6 Lines
Jack and skidsystem
60 Ton Crane
6.25 L x 3.9 W x 3.89 h MTS. -95 Ton
Codensa
Load, unload and transport power transformers.
Transport and rental of cranes for loading / unloading and assembly.
Modular 12 Lines
Modular 10 Lines
Jack and skidsystem
3 transformers of 7.5 Lx 3.8 W x 4 H mts. –120 Ton
2 6 L x 4.50 W x 4 H mts transformers. 85 Ton
Transportation of a Concrete Mill
Transportation, direct unload and freight.
Modular 12 lines
Jack and skidsystem
16.21 L x 3.40 W x 3.95 H mts. -180 Ton
Transport low, medium and high voltage shelters.
Transport and download.
Low bed of 3,4, 6 axles
Modular 6 lines
10 shelters of 17.5 L x 4.92 W x 4.3 H mts.-57 Ton
Ground and river transport, roll off operation of a cement ferrule.
Ground and river transport. Porting, roll off operation, crane supply, route study and transportation plans design.
Modular 12 lines
100 ton, 120 ton and 150 ton crane
Modular 6 lines
Elephant feet
8 pieces of 9 L x 5.15 W x 5.45 H -37 Ton
Transport, vertical support for installation.
Reception of vessel in port
Transfer to storage yard
Engineering and path study
Logistics
planning
Low Bed 3 extendable axles
Low Bed 4 axes beams
Low Bed Extendable 6-axle
Low Bed 8 axles
Crane RT 90 TONS
35-meter long pieces
Weight 55 tones
Transport low, medium and high voltage shelters.
Direct Port Unload
River transport
Ground transportation
Roll and landing operation
Modular 24 lineasside by side
River barge for 600 ton
Beams and blocking equipment
L 15 - W 7.5 - H 11 mts, Weight 210 ton
Reception in port, storage and transport of 39 blades.
Return of existing blades to port for later freight dispatch by boat.
Reception in port of ship, 39 blades
Transfer to storage yard
Plant distribution engineering
Delivery of blades at final destination
2 Cranes 60 tones
3 extensible trailers 48 meters long
Cars escort
Blades of 11 ton / u -large: 58 mts
It is the largest and most important infrastructure project in the region. Our engineering department planned the transportation and lifting of more than 700 tons of cargo delivered to the two work fronts.
Transport and assembly of 1500 beams
Engineering
2 Cranes of 400 tons
2 Cranes 500 ton
Modular 6L -6L with turntable
14 prime movers
Extensible modular equipment of 6 and 8 axles
Each 30 meters in length, 4.85 meters wide and 170 tons in weight for the 23 km Viaduct Line Two of the Metro.
Assembly of the entire Cementos Progreso plant
Transportation and assembly
Engineering
Cranes of 225 tons-120 tons-100 tons-80 tons
Modular beams 9 lines
Transport of 8 engines and 8 generators of 320 and 95 tons.
Port reception and unloading, transport and assembly. Reinforcement of bridges
Gantry 5oo ton
Modular 24 SPMT lines
Jack and SkiddingSystem
Generators of 320 and 95 ton.
Transportation and unloading of wind turbine components.
Transfer to storage patio and distribution in plant. Porting, storage and overnight transport to the project site study and route planning
Modular 20 lines
Extending high bed 42 mts.
Extension base bed
4 to 8 axes up to 35 mts.
Crane RT 80 TONTS
86 Wind towers 10 pieces per day in 10 vehicles and 2 caravans. Pieces of 27.9 mts and width 5,150
Shippment Costa Rica Puerto Moin
Transport and lifting – sobre barcaza
Crane Kobelco – Celosía 250 tons
Industrial park Canavita Km 22 via Tocancipa, Cundinamarca. Colombia
Tel. (571) 542 20 00
comercial@maxo.co gestionhumana@maxo.co infomaxo@maxo.coPBX: +57 (7) 885 19 83Dir: Calle 1 Sur No. 7-131 B
Cel: +57 321 208 78 23Dir: KM12 Vereda el progreso
PBX: +57 (5) 374 23 60Dir: Carrera 30 No. 29A - 154
Cel: +57 313 806 46 12Dir: Patio de ensamble, mina del cerrejon.
Cel: (507) 642 711 97 Dir: Ave. Aquilinio de La Guardia Calle 57
Cel: +57 310 618 56 74Dir: Km 6 vía Puerto López
View our Data Processing Policy, for requests, complaints and / or complaints click here
MAXO 2017 all rights reserved. By bamboo
Call us on